Construction Supervision for Shvanidzor-Verishen-Tsav Road Project

Nov 10, 2017 uncategorized

Assignment name: Construction Supervision for Shvanidzor-Verishen-Tsav Road Project

Country: Armenia

Location within country: Armenia

Name of Client: Ministry of Transport and Communications of Republic of Armenia

Duration of assignment (years): 3

 

Narrative description of Project

Reconstruction of the old road.

Total Length : 33.5km (Widening : 33.5km), Width : 12

Design Speed : 90km/h, 6 Bridges

Asphalt Concrete Pavement

Activities Performed

Responsible for supervising the road and bridge construction activities including earthworks and pavement construction, and drainage. He was responsible for daily inspection, material testing, quality and quantity control, design review, progress monitoring, preparation of report etc